Major Capex Projects

Mining Segment

lebedinsky GOK
  • Construction of the third hot briquetted iron plant (HBI-3 Plant)
  • Deployment of continuous cycle ore mining technology at the open-pit mine
  • Expansion of the external power supply network
Mikhailovsky GOK
  • Construction of a crushing and conveyor facility
  • Construction of a concentrate intake facility


Steel Segment

OEMK
  • Re-equipment of DRI Plant #2, involving the replacement of the reformer tubes and construction of a pellet intake section
  • Installation of a reduction and calibration section at Rolling Mill 350’s mid-size production line
  • Construction of a heat treatment facility for hot-rolled steel
Ural Steel
  • Construction of the Roller Treatment Furnace #1 and Heat Treatment Machine #1
  • Complex Upgrade of Continuous Casting Machine #1 and the vacuum degasser
  • Construction of medium pressure boilers for the thermal power plant
  • Upgrade of Blast Furnace #2
Stephen C. Montague
President & CEO, Midrex Technologies, Inc.
Congratulations to Metalloinvest’s Lebedinsky GOK, for its HBI-3 Plant project winning the ‘Main Event in the Russian Steel Industry 2017’ competition, as well as the prize for ’Investment Project of the Year‘ at the Russian Mining Excellence Awards 2017. The HBI-3 Plant at Lebedinsky GOK is the latest successful venture in the longstanding relationship between Metalloinvest and Midrex, that includes four DRI modules at OEMK’s electric arc furnace (EAF) steelmaking facility, and HBI-2 Plant at Lebedinsky GOK.
Mining Segment
Steel Segment
Dmitry Paryshev
General Director, CJSC Kurganstalmost
We have been partners with Metalloinvest since our company was founded. We can safely say that all our major projects, from Russia’s Far East to Kaliningrad, are built in close cooperation with Metalloinvest, and specifically, Ural Steel.
From bridges and facilities built in Vladivostok for the Asia-Pacific Economic Cooperation (APEC) Russia 2012 summit, to dozens of Olympic facilities in Sochi, to the 2018 FIFA World Cup stadiums – all our strategic construction projects in Russia would have been impossible without Kurganstalmost’s metalwork manufactured from Ural Steel’s rolled steel.
The most important thing is that we will continue to rely on Metalloinvest’s companies in the future and seek to enhance our cooperation for the benefit of our companies and all of Russia.